
|
Talübergang Schottwien
Austria
Prestressed concrete bridge with four spans (142 m + 250 m + 162 m + 77 m). Calculation with non-linear geometry and non-linear material behaviour due to piers with 130 m height. Built using the balanced cantilevering method.
|
- Contract:
- Talübergang Schottwien Bridge, Austria
- Consultant:
- Dipl.-Ing. VOGLER, Wien, Austria
- State of Construction:
- TDV Involvement:
- Bridge modeling
- General advice on construction stage analysis
- Nonlinear Structural Analysis for Construction Stage and Final Stage
- Optimization of the stressing procedure for the tendons
- Analysis of the final closure of the bridge
- Full pre-camber calculation
|
|